Standards Worldwide
Standards Worldwide
Phone +49 30 58885700-07

Standard [WITHDRAWN]

DIN EN 50367:2017-01

VDE 0115-605:2017-01

Railway applications - Current collection systems - Technical criteria for the interaction between pantograph and overhead line (to achieve free access); German version EN 50367:2012 + AC:2013 + A1:2016

German title
Bahnanwendungen - Zusammenwirken der Systeme - Technische Kriterien für das Zusammenwirken zwischen Stromabnehmer und Oberleitung für einen freien Zugang; Deutsche Fassung EN 50367:2012 + AC:2013 + A1:2016
Publication date
2017-01
Original language
German
Pages
45

95.25 EUR VAT included

89.02 EUR VAT excluded

Format and language options

Shipment (3-5 working days) 1
  • 95.25 EUR

Monitor with the Standards Ticker

1

 Attention: Document withdrawn!

Easily subscribe: Save time and money now!

You can also subscribe to this document - together with other important standards in your industry. This makes your work easier and pays for itself after a short time.

Sparschwein_data
Subscription advantages
Sparschwein Vorteil 1_data

Important standards for your industry, regularly updated

Sparschwein Vorteil 2_data

Much cheaper than buying individually

Sparschwein Vorteil 3_data

Useful functions: Filters, version comparison and more

Publication date
2017-01
Original language
German
Pages
45

Quick delivery via download or delivery service

Buy securely with a credit card or pay upon receipt of invoice

All transactions are encrypted

Overview

This European Standard defines the interoperability parameters with regard to interaction between pantographs and overhead contact lines. The document specifies the interface requirements for rolling stock and the infrastructure for free access to the European railway network. Performance of the interface overhead line - pantograph is subject to conformance testing. The functional requirements for uninterruptible power supply are described. These requirements refer to the geometrical profile of the pantograph head and the dynamic vehicle behavior (for example, dynamic clearance gauge) and guarantee that at least one contact wire within the contact area of the pantograph head (including all tolerances). The standard describes parameters and values for all planned lines and future lines. The responsible committee is Subcommittee DKE/UK 351.2 "Ortsfeste Anlagen" ("Fixed installations") of the DKE (German Commission for Electrical, Electronic and Information Technologies) at DIN and VDE.

Cooperation at DIN

Loading recommended items...
Loading recommended items...
Loading recommended items...