Standards Worldwide
Standards Worldwide
Phone +49 30 58885700-07

Standard [CURRENT]

DIN VDE 0119-207-6:2017-10

VDE 0119-207-6:2017-10

State of the railway vehicles - Control and instrumentation technology - Part 207-6: On-board equipment - PZB (intermittent automatic train-running control)

German title
Zustand der Eisenbahnfahrzeuge - Leittechnik - Teil 207-6: Fahrzeugeinrichtung - PZB (punktförmige Zugbeeinflussung)
Publication date
2017-10
Original language
German
Pages
12

38.58 EUR VAT included

36.06 EUR VAT excluded

Format and language options

Shipment (3-5 working days)
  • 38.58 EUR

Monitor with the Standards Ticker

This option is only available after login.
Easily subscribe: Save time and money now!

You can also subscribe to this document - together with other important standards in your industry. This makes your work easier and pays for itself after a short time.

Sparschwein_data
Subscription advantages
Sparschwein Vorteil 1_data

Important standards for your industry, regularly updated

Sparschwein Vorteil 2_data

Much cheaper than buying individually

Sparschwein Vorteil 3_data

Useful functions: Filters, version comparison and more

Publication date
2017-10
Original language
German
Pages
12

Quick delivery via download or delivery service

Buy securely with a credit card or pay upon receipt of invoice

All transactions are encrypted

Overview

Wear, failures and other damage influence the operational safety of railway vehicles. Depending on the wear characteristics, application parameters and the current state of the railway vehicles and the cost effectiveness, a maintenance system shall be specified by which it is ensured that the necessary target state is maintained and the specified maintenance and test methods are applied. This document applies for the vehicle function intermittent automatic train-running control (PZB), which is used in the following types with the manufacturer designations - I 60-M-SEL; - I 60-Siemens/ER 24, system PZB 90; - I 60-SEL/ER 24, system PZB 90; - I 60-R, PZB 90 system; - I 80, PZB 90 system; - I 80E, PZB 90 system; - PZ 80-R, PZB 90 system; - EBI Cab 500; - EBI Cab 2000; - EBI Cab 2000 DES; - TGB-I, Trainguard Basic Indusi. The responsible committee is DKE/UK 351.3 "Bahn-Signalanlagen" ("Signalling systems for railways") of the DKE (German Commission for Electrical, Electronic and Information Technologies) at DIN and VDE.

Replacement amendments

Cooperation at DIN

Loading recommended items...
Loading recommended items...
Loading recommended items...