Standards Worldwide
Standards Worldwide
Phone +49 30 58885700-07

Standard [WITHDRAWN]

DIN EN 60099-5:2014-09

VDE 0675-5:2014-09

Surge arresters - Part 5: Selection and application recommendations (IEC 60099-5:2013); German version EN 60099-5:2013

German title
Überspannungsableiter - Teil 5: Anleitung für die Auswahl und die Anwendung (IEC 60099-5:2013); Deutsche Fassung EN 60099-5:2013
Publication date
2014-09
Original language
German
Pages
153

208.67 EUR VAT included

195.02 EUR VAT excluded

Format and language options

Shipment (3-5 working days) 1
  • 208.67 EUR

Monitor with the Standards Ticker

1

 Attention: Document withdrawn!

Easily subscribe: Save time and money now!

You can also subscribe to this document - together with other important standards in your industry. This makes your work easier and pays for itself after a short time.

Sparschwein_data
Subscription advantages
Sparschwein Vorteil 1_data

Important standards for your industry, regularly updated

Sparschwein Vorteil 2_data

Much cheaper than buying individually

Sparschwein Vorteil 3_data

Useful functions: Filters, version comparison and more

Publication date
2014-09
Original language
German
Pages
153

Quick delivery via download or delivery service

Buy securely with a credit card or pay upon receipt of invoice

All transactions are encrypted

Overview

This part of IEC 60099 is not a mandatory standard but provides information, guidance, and recommendations for the selection and application of surge arresters to be used in three phase systems with nominal voltages above 1 kV. It applies to gapless metal-oxide surge arresters as defined in IEC 60099-4, to surge arresters containing both series and parallel gapped structure - rated 52 kV and less as defined in IEC 60099-6 and metal-oxide surge arresters with external series gap for overhead transmission and distribution lines (EGLA) as defined in IEC 60099-8. In Annex H, some aspects regarding the old type of SiC gapped arresters are discussed. The principle of insulation coordination for an electricity system is given in IEC 60071 and IEC 60071-2 standards. Basically the insulation coordination process is a risk management aiming to ensure the safe, reliable and economic design and operation of high voltage electricity networks and substations. The use of surge arresters helps to achieve a system and equipment insulation level and still maintaining an acceptable risk and the best economic of scale. The introduction of analytical modelling and simulation of power system transients further optimise the equipment insulation level. The selection of surge arresters has become more and more important in the power system design and operation. It is worthwhile to note that the reliability of the power system and equipment is dependent on the safety margin adopted by the user in the design and selection of the equipment and surge arresters. Surge arrester residual voltage is a major parameter of which most users have paid a lot of attention to when selecting the type and rating. The typical maximum surge arresters residual voltage are given in Annex F. It is likely, however, that for some systems, or in some countries, the system reliability requirements and design are sufficiently uniform that the recommendations of the present standard may lead to the definition of narrow ranges of arresters. The user of surge arresters will, in that case, not be required to apply the whole process introduced here to any new installation and the selection of characteristics resulting from prior practice may be continued. The responsible committee is DKE/K 441 "Überspannungsableiter" ("Surge arresters") of the DKE (German Commission for Electrical, Electronic and Information Technologies) at DIN and VDE.

Replacement amendments

This document replaces DIN EN 60099-5:2000-09; VDE 0675-5:2000-09 .

This document has been replaced by: DIN EN IEC 60099-5:2019-02; VDE 0675-5:2019-02 .

Cooperation at DIN

Loading recommended items...
Loading recommended items...
Loading recommended items...
Loading recommended items...