Dear Customer

Our Customer Service will be available again as of 2 January 2025

Please note that new registrations and requests to be processed manually will only be processed from this point onwards.

You can of course place orders and receive downloads online at any time.

We wish you happy holidays, a peaceful time and a healthy New Year!

Your DIN Media

Standards Worldwide
Standards Worldwide
Phone +49 30 58885700-07

Standard [CURRENT]

DIN EN 1253-5:2017-05

Gullies for buildings - Part 5: Gullies with light liquids closure; German version EN 1253-5:2017

German title
Abläufe für Gebäude - Teil 5: Abläufe mit Leichtflüssigkeitssperre; Deutsche Fassung EN 1253-5:2017
Publication date
2017-05
Original language
German
Pages
11

from 56.60 EUR VAT included

from 52.90 EUR VAT excluded

Format and language options

PDF download
  • 56.60 EUR

  • 67.90 EUR

  • 70.70 EUR

Shipment (3-5 working days)
  • 68.30 EUR

  • 85.70 EUR

Monitor with the Standards Ticker

This option is only available after login.
Easily subscribe: Save time and money now!

You can also subscribe to this document - together with other important standards in your industry. This makes your work easier and pays for itself after a short time.

Sparschwein_data
Subscription advantages
Sparschwein Vorteil 1_data

Important standards for your industry, regularly updated

Sparschwein Vorteil 2_data

Much cheaper than buying individually

Sparschwein Vorteil 3_data

Useful functions: Filters, version comparison and more

Publication date
2017-05
Original language
German
Pages
11
DOI
https://dx.doi.org/10.31030/2547978

Quick delivery via download or delivery service

Buy securely with a credit card or pay upon receipt of invoice

All transactions are encrypted

Overview

The revision of this standard was necessary due to the introduction of the new standards for floor gullies with an odour trap with an odour trap height of at least 50 mm (EN 1253-1) and for the conformity assessment of floor gullies, roof drains and covers (EN 1253-3), as well as changes to the scope of application, classification, functional requirements and marking procedure. Gullies with light liquid closure for buildings are applied to avoid uncontrolled discharge of light liquids into drainage systems in case of emergency. After a classification of gullies with a light liquid closure according to their drainage capacity (unlimited use in gravity drainage systems, reduced drainage with light liquid closure as an additional device in gullies) and material requirements, functional requirements (inlet, security height, tightness, requirements for maintenance and drainage capacity) that go beyond EN 1253-1 are specified. In addition to the test procedures specified in EN 1253-1, the tests for the blocking function, tightness and safety height shall also be carried out. Modalities for marking and assessing conformity conclude the specifications. The responsible committee is Working Committee NA 119-05-11 AA "Ablaufgarnituren, Abläufe, Rückstauverschlüsse und Belüftungsventile für die Verwendung innerhalb von Gebäuden (CEN/TC 165/WG 11)" ("Waste fittings, drains, anti-flooding devices and air vents for use inside buildings (CEN/TC 165/WG 11)") at DIN Standards Committee Water Practice (NAW).

Content
ICS
91.140.80
DOI
https://dx.doi.org/10.31030/2547978
Replacement amendments

This document replaces DIN EN 1253-5:2004-03 .

Cooperation at DIN

Also available in
Loading recommended items...
Loading recommended items...
Loading recommended items...
Loading recommended items...