Foreword
Introduction
Scope
Normative references
Terms and definitions
Classification
Marking
Dimensions and ratings
Show subsection Close subsection External dimensions
Internal dimensions
Ratings
Design requirements
Show subsection Close subsection General
Corner fittings
Base structure
End structure
Side wall structure
Walls
Door opening
Sanitary and taint-free requirements
Requirements for optional features
Show subsection Close subsection Fork-lift pockets
Gooseneck tunnels
Drains
Water connections
Air inlets and outlets
Intermediate sockets for clip-on units
Hanging cargo facilities
Modified atmospheres
Ventilation control
Humidity control
Testing
Show subsection Close subsection General
Test No. 1 — Stacking
Show subsection Close subsection General
Procedure
Requirements
Test No. 2 — Lifting from the four top corner fittings
Show subsection Close subsection General
Procedure
Requirements
Test No. 3 — Lifting from the four bottom corner fittings
Show subsection Close subsection General
Procedure
Requirements
Test No. 4 — External restraint (longitudinal)
Show subsection Close subsection General
Procedure
Requirements
Test No. 5 — Strength of end walls
Show subsection Close subsection General
Procedure
Requirements
Test No. 6 — Strength of side walls
Show subsection Close subsection General
Procedure
Requirements
Test No. 7 — Strength of the roof
Show subsection Close subsection General
Procedure
Requirements
Test No. 8 — Floor strength
Show subsection Close subsection General
Procedure
Requirements
Test No. 9 — Rigidity (transverse)
Show subsection Close subsection General
Procedure
Requirements
Test No. 10 — Rigidity (longitudinal)
Show subsection Close subsection General
Procedure
Requirements
Test No. 11 — Lifting from fork-lift pockets (where provided)
Show subsection Close subsection General
Procedure
Show subsection Close subsection 1CC, 1C or 1D thermal containers fitted with one set of fork-lift pockets
1CC or 1C thermal containers fitted with two sets of fork-lift pockets
Requirements
Test No. 12 — Weatherproofness
Show subsection Close subsection General
Procedure
Requirements
Test No. 13 — Airtightness test
Show subsection Close subsection General
Procedure
Requirements
Test No. 14 — Heat leakage test
Show subsection Close subsection Test No. 15 a) — Test of the performance of a thermal container under refrigeration by a mechanical refrigeration unit (MRU)
Show subsection Close subsection General
Test conditions
Test procedure
Requirements
Test No. 15 b) — Functional test of a thermal container at high ambient temperatures while being cooled by a mechanical refrigeration unit (MRU)
Show subsection Close subsection General
Test condition
Test procedure
Requirements
Test No. 15 c) — Test of the performance of a thermal container with refrigerating equipment which uses a liquid expendable refrigerant (LER)
Show subsection Close subsection General
Test conditions
Test procedure
Requirements
Test No. 16 — Strength of mounting devices for removable equipment (where fitted)
Show subsection Close subsection General
Test No. 16 a) — Vertical loading
Show subsection Close subsection General
Procedure
Requirements
Test No. 16 b) — Horizontal loading
Show subsection Close subsection General
Procedure
Requirements
Electrical aspects of thermal containers
Show subsection Close subsection General
General requirements for standard voltage equipment
220 volt and dual voltage equipment
Remote condition monitoring
Diagrammatic representation of capabilities appropriate to all types and sizes of thermal containers, except where otherwise stated (normative)
Details of requirements for load-transfer areas in base structures of containers (normative)
Show subsection Close subsection Purpose
Requirements
Gooseneck tunnel transfer areas
Dimensions of fork-lift pockets (where provided) (normative)
Dimensions of gooseneck tunnels (where provided) (normative)
Cooling water connections (normative)
Air inlets and outlets (normative)
Show subsection Close subsection Air apertures in end walls of 1AA thermal containers
Show subsection Close subsection Dimensions
Area about air circulation openings (see Figure F.1)
Closures for apertures
Air apertures in end walls of 1CC thermal containers
Show subsection Close subsection Dimensions
Area about air circulation openings (see Figure F.2)
Closures for apertures
Air apertures in end walls of 1C thermal containers
Show subsection Close subsection Dimensions
Area about air circulation openings (see Figure F.3)
Closures for apertures
Mounting of clip-on units (normative)
Air temperature measurement points (normative)
Steady-state conditions for heat leakage test (Test No. 14) (normative)
Phase connections to container plugs and sockets (normative)
Electric plug and socket, four-pin, 380/440 V, 50/60 Hz, 32 A (normative)
Electrical power supplies for thermal containers (9.2) (normative)
General requirements for 220 volt and dual voltage equipment (normative)
Show subsection Close subsection 220 volt equipment
Dual voltage equipment
Conversion of SI units to non-SI units (informative)
Bibliography