Dear Customer
Our Customer Service will be available again as of 2 January 2025.
Please note that new registrations and requests to be processed manually will only be processed from this point onwards.
You can of course place orders and receive downloads online at any time.
We wish you happy holidays, a peaceful time and a healthy New Year!
Your DIN Media
Standard [CURRENT]
Product information on this site:
Quick delivery via download or delivery service
All transactions are encrypted
This document establishes general principles for the execution of displacement piles, that means piles which are installed in the ground without excavation or removal of material from the ground except for limiting heave and/or limiting vibration as well as removal of obstructions or to assist penetration. Piles are driven into the ground using impact, vibration, pressing, screwing or a combination of these methods. The committee responsible for this standard is NA 005-05-07 AA "Baugrund; Pfähle (SpA zu CEN/TC 288/WG 16 sowie CEN/TC 341/WG 4 und 7)" ("Soil; piles (Mirror Committee of CEN/TC 288/WG 16, and CEN/TC 341/WG 4 and 7)") at DIN Standards Committee Building and Civil Engineering (NABau).
This document replaces DIN EN 12699 Berichtigung 1:2010-11 , DIN EN 12699:2001-05 .