Standards Worldwide
Standards Worldwide
Phone +49 30 58885700-07

Standard [CURRENT]

DIN 86080:2012-02

Ships and marine technology - System co-ordination plans in shipbuilding; Text in German and English

German title
Schiffe und Meerestechnik - Systemkoordinierungspläne im Schiffbau; Text Deutsch und Englisch
Publication date
2012-02
Original language
German, English
Pages
48

from 129.30 EUR VAT included

from 120.84 EUR VAT excluded

Format and language options

PDF download
  • 129.30 EUR

Shipment (3-5 working days)
  • 156.30 EUR

Monitor with the Standards Ticker

This option is only available after login.
Easily subscribe: Save time and money now!

You can also subscribe to this document - together with other important standards in your industry. This makes your work easier and pays for itself after a short time.

Sparschwein_data
Subscription advantages
Sparschwein Vorteil 1_data

Important standards for your industry, regularly updated

Sparschwein Vorteil 2_data

Much cheaper than buying individually

Sparschwein Vorteil 3_data

Useful functions: Filters, version comparison and more

Publication date
2012-02
Original language
German, English
Pages
48
DOI
https://dx.doi.org/10.31030/1822838

Quick delivery via download or delivery service

Buy securely with a credit card or pay upon receipt of invoice

All transactions are encrypted

Overview

This standard is a product standard for ships and marine technology and specifies basics for the design performance of systems co-ordination of commercial vessels and vessels of the navy. DIN 86080 is not applicable to workshop drawings for piping in double bottoms, tanks, cofferdams, etcetera, for which parts lists are provided. An important part of the standard is to specify guidelines and recommendations for the appropriate arrangement and co-ordination of cable trays, ventilation ducts and systems in shipbuilding. The document describes the types of system co-ordination, the scope of system co-ordination, the concepts of work and the groups of drawings and documents to be considered in chronological order. Due to the specified order of system co-ordination, the principal arrangement of the co-ordination runs is already considered during the design of the vessel and of its steel structure which results in significant cost savings for prefabrication and subsequent mounting. Presentation examples of co-ordination runs or arrangements, such as deck penetrations, are given in tables and figures and recommendations for the arrangement of systems are documented.

Content
ICS
01.100.01, 35.240.10, 47.020.01
DOI
https://dx.doi.org/10.31030/1822838
Replacement amendments

This document replaces DIN 86080:2004-09 .

Cooperation at DIN

Loading recommended items...
Loading recommended items...
Loading recommended items...