Standards Worldwide
Standards Worldwide
Phone +49 30 58885700-07

Pre-standard [WITHDRAWN]

DIN IEC/TS 61400-26-3:2017-07

VDE V 0127-26-3:2017-07

Wind energy generation systems - Part 26-3: Availability for wind power stations (IEC/TS 61400-26-3:2016)

German title
Windenergieanlagen - Teil 26-3: Verfügbarkeit von Windkraftwerken (IEC/TS 61400-26-3:2016)
Publication date
2017-07
Original language
German
Pages
124
Procedure
Pre-Standard

181.57 EUR VAT included

169.69 EUR VAT excluded

Format and language options

Shipment (3-5 working days) 1
  • 181.57 EUR

Monitor with the Standards Ticker

1

 Attention: Document withdrawn!

Easily subscribe: Save time and money now!

You can also subscribe to this document - together with other important standards in your industry. This makes your work easier and pays for itself after a short time.

Sparschwein_data
Subscription advantages
Sparschwein Vorteil 1_data

Important standards for your industry, regularly updated

Sparschwein Vorteil 2_data

Much cheaper than buying individually

Sparschwein Vorteil 3_data

Useful functions: Filters, version comparison and more

Publication date
2017-07
Original language
German
Pages
124
Procedure
Pre-Standard

Quick delivery via download or delivery service

Buy securely with a credit card or pay upon receipt of invoice

All transactions are encrypted

Overview

This Technical Specification defines general concepts of wind energy generation systems and environmental boundary conditions for the description of system and component availability, service life expectancy, repairs and criteria for determining maintenance intervals. The basic approach is based on the assumption that a wind power plant can be modeled as a wind turbine representing a complete wind energy generation system. Seen from the connection point, the wind power plant consists of all wind energy generation systems, functional services and elements of the plant periphery. It clearly describes how the data is to be categorized and gives examples of how the data can be used to derive the availability indicators. The specification also defines the terminology and terms for logging the availability indicators based on energy generation. A generation unit includes all facilities up to the point of connection. Availability measurements are concerned with proportions of time and energy that a unit can deliver during operation, taking into account environmental aspects. Environmental aspects include wind and weather conditions, but also grid and station conditions. The responsible committee is DKE/K 383 "Windenergieanlagen" ("Wind turbines") of the DKE (German Commission for Electrical, Electronic and Information Technologies) at DIN and VDE.

Replacement amendments

This document has been replaced by: DIN CLC/TS 61400-26-3:2018-07; VDE V 0127-26-3:2018-07 .

Cooperation at DIN

Loading recommended items...
Loading recommended items...
Loading recommended items...
Loading recommended items...