Dear Customer

Our Customer Service will be available again as of 2 January 2025

Please note that new registrations and requests to be processed manually will only be processed from this point onwards.

You can of course place orders and receive downloads online at any time.

We wish you happy holidays, a peaceful time and a healthy New Year!

Your DIN Media

Standards Worldwide
Standards Worldwide
Phone +49 30 58885700-07

Pre-standard [WITHDRAWN]

DIN CLC/TS 50549-1:2016-07

VDE V 0124-549-1:2016-07

Requirements for generating plants to be connected in parallel with distribution networks - Part 1: Connection to a LV distribution network above 16 A; German version CLC/TS 50549-1:2015

German title
Anforderungen für zum Parallelbetrieb mit einem Verteilnetz vorgesehene Erzeugungsanlagen - Teil 1: Anschluss an das Niederspannungsverteilnetz über 16 A je Phase; Deutsche Fassung CLC/TS 50549-1:2015
Publication date
2016-07
Original language
German
Pages
54
Procedure
Pre-Standard

105.73 EUR VAT included

98.81 EUR VAT excluded

Format and language options

Shipment (3-5 working days) 1
  • 105.73 EUR

Monitor with the Standards Ticker

1

 Attention: Document withdrawn!

Easily subscribe: Save time and money now!

You can also subscribe to this document - together with other important standards in your industry. This makes your work easier and pays for itself after a short time.

Sparschwein_data
Subscription advantages
Sparschwein Vorteil 1_data

Important standards for your industry, regularly updated

Sparschwein Vorteil 2_data

Much cheaper than buying individually

Sparschwein Vorteil 3_data

Useful functions: Filters, version comparison and more

Publication date
2016-07
Original language
German
Pages
54
Procedure
Pre-Standard

Quick delivery via download or delivery service

Buy securely with a credit card or pay upon receipt of invoice

All transactions are encrypted

Overview

This prestandard specifies the technical guidelines on the requirements for generation plants that can be operated in parallel with a distribution network. If settings are to be defined and/or provided, this prestandard refers to the distribution system operator (DSO) for practical reasons, even if these settings are to be defined and/or provided by another actor according to national or European regulatory frameworks. This includes European network codes and their national implementation as well as other national regulations. Further national regulations, in particular for connection to the distribution network and operation of the generating plant, may apply. The requirements of this Technical Specification apply to all generating plants, electrical machines and electronic equipment that meet the following conditions, regardless of the primary energy source used and regardless of the presence of loads in the plant operator's network: - conversion of any primary energy into alternating current; - connection to a medium-voltage distribution network and rated currents above 16 A per phase; - intended to be operated in parallel with this distribution network under normal network operating conditions. Generating plants with rated current up to and including 16 A per phase are regulated in EN 50438. Generating plants connected to a medium voltage network are within the scope of CLC/TS 50549-2. Unless otherwise specified by the distribution system operator (DSO), generation equipment connected to a medium voltage system and having an apparent power of up to 100 kVA may comply with this Technical Specification as an alternative to the requirements of CLC/TS 50549-2. A different threshold may be specified by the DSO. This prestandard establishes prerequisites for connection. This prestandard recognizes the existence of national standards, network codes and specific technical requirements of DSOs. These should be complied with. Note on translation: due to the European framework, "should" is formulated here; in the national implementation, the requirements of the TSOs shall be complied with according to the national foreword. Excluded from the scope are: - the selection and evaluation of the point of connection; - power system impact assessment; - connection assessment; - island operation of generating plants, both intentional and unintentional, where no part of the distribution network is involved; - drives feeding breaking energy back into the distribution network for limited duration; - requirements for the safety of personnel as they are already adequately covered by existing European Standards. The responsible committee is DKE/K 261 "Systemaspekte der elektrischen Energieversorgung" ("System aspects of electrical energy supply") of the DKE (German Commission for Electrical, Electronic and Information Technologies) at DIN and VDE.

Replacement amendments

This document has been replaced by: DIN EN 50549-1:2020-10; VDE 0124-549-1:2020-10 .

Cooperation at DIN

Loading recommended items...
Loading recommended items...
Loading recommended items...
Loading recommended items...