Dear Customer

Our Customer Service will be available again as of 2 January 2025

Please note that new registrations and requests to be processed manually will only be processed from this point onwards.

You can of course place orders and receive downloads online at any time.

We wish you happy holidays, a peaceful time and a healthy New Year!

Your DIN Media

Standards Worldwide
Standards Worldwide
Phone +49 30 58885700-07

Standard [WITHDRAWN]

DIN EN 62116:2012-01

VDE 0126-2:2012-01

Test procedure of islanding prevention measures for utility-interconnected photovoltaic inverters (IEC 62116:2008, modified); German version EN 62116:2011

German title
Prüfverfahren für Maßnahmen zur Verhinderung der Inselbildung für Versorgungsunternehmen in Wechselwirkung mit Photovoltaik-Wechselrichtern (IEC 62116:2008, modifiziert); Deutsche Fassung EN 62116:2011
Publication date
2012-01
Original language
German
Pages
28

67.36 EUR VAT included

62.95 EUR VAT excluded

Format and language options

Shipment (3-5 working days) 1
  • 67.36 EUR

Monitor with the Standards Ticker

1

 Attention: Document withdrawn!

Easily subscribe: Save time and money now!

You can also subscribe to this document - together with other important standards in your industry. This makes your work easier and pays for itself after a short time.

Sparschwein_data
Subscription advantages
Sparschwein Vorteil 1_data

Important standards for your industry, regularly updated

Sparschwein Vorteil 2_data

Much cheaper than buying individually

Sparschwein Vorteil 3_data

Useful functions: Filters, version comparison and more

Publication date
2012-01
Original language
German
Pages
28

Quick delivery via download or delivery service

Buy securely with a credit card or pay upon receipt of invoice

All transactions are encrypted

Overview

The purpose of this European Standard is to describe a test procedure to evaluate the performance of islanding prevention measures used with utility-interconnected PV systems. This standard does not specify settings parameters (voltage and frequency trip magnitude and trip time) nor pass/fail criteria, because national standards and/or grid codes should be taken into account for this purpose. This standard describes a guideline for testing the performance of automatic islanding prevention measures installed in or with single- or multi-phase utility interactive PV inverters connected to the utility grid. The test procedure and criteria described are minimum requirements that will allow repeatability. Additional requirements or more stringent criteria may be specified if demonstrable risk can be shown. Inverters and other devices meeting the requirements of this standard are considered non-islanding as defined in CLC/TS 61836. This standard may be applied to other types of utility-interconnected systems (for example, inverterbased microturbine and fuel cells, induction and synchronous machines). However, technical review may be necessary for other than inverter-based PV systems. The responsible committee is K 373 "Photovoltaische Solarenergie-Systeme" ("Solar photovoltaic energy systems") of the DKE (German Commission for Electrical, Electronic and Information Technologies) of DIN and VDE.

Replacement amendments

This document has been replaced by: DIN EN 62116:2014-11; VDE 0126-2:2014-11 .

Cooperation at DIN

Loading recommended items...
Loading recommended items...
Loading recommended items...