Standards Worldwide
Standards Worldwide
Phone +49 30 58885700-07

Standard [CURRENT]

ASTM F 3632:2023

Standard Practice for Close Tolerance Pipe Slurrification (CTPS) Method to Replace, Rehabilitate, and Repair Existing Buried Asbestos Cement (AC) Pipe Systems

Publication date
2023
Original language
English
Pages
6

from 73.80 EUR VAT included

from 68.97 EUR VAT excluded

Format and language options

PDF download
  • 73.80 EUR

Shipment (3-5 working days)
  • 82.10 EUR

Monitor with the Standards Ticker

This option is only available after login.
Easily subscribe: Save time and money now!

You can also subscribe to this document - together with other important standards in your industry. This makes your work easier and pays for itself after a short time.

Sparschwein_data
Subscription advantages
Sparschwein Vorteil 1_data

Important standards for your industry, regularly updated

Sparschwein Vorteil 2_data

Much cheaper than buying individually

Sparschwein Vorteil 3_data

Useful functions: Filters, version comparison and more

Publication date
2023
Original language
English
Pages
6
DOI
https://dx.doi.org/10.1520/F3632-23

Quick delivery via download or delivery service

Buy securely with a credit card or pay upon receipt of invoice

All transactions are encrypted

Short description
1.1 This practice covers the requirements and test methods of an EPA-approved alternative work practice (AWP) for the replacing of an Asbestos Cement (AC) pipe by the Close Tolerance Pipe Slurrification Method in accordance with said EPA CTPS AWP issued on June 10, 2019. This process utilizes a patented method (US 10,557,587 B2) 2 and other specially designed tools designed to work with the EPA regulations surrounding AC pipe work. Specifically, the special (patented) back reaming tool (US 8,365,841 B2) 2 delivers the required bentonite-based fluid to maintain a wet cutting environment which is an important requirement for cutting Asbestos Cement Material (ACM). The sizing of the cutting head is set at 0.25 in. in diameter greater than the replacement pipe's outside diameter to facilitate the removal of the ACM. This close tolerance sizing creates a scenario where the new pipe, along with the injection of the drill fluid, will allow the slurry to flow and subsequently expel at pre-determined pit locations. The slurry containing the ACM is then removed from the site and properly disposed of. Any remaining trace amounts of asbestos fiber in the ground are encapsulated in a skim coat of the slurry remaining around the new pipe, the skim coat having the consistency of a lightweight concrete material commonly known as excavatable flowable fill. 1.2 Units- The values stated in SI units are to be regarded as the standard. No other units of measurement are included in this standard. 1.3 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety, health, and environmental practices and determine the applicability of regulatory limitations prior to use. 1.4 This international standard was developed in accordance with internationally recognized principles on standardization established in the Decision on Principles for the Development of International Standards, Guides and Recommendations issued by the World Trade Organization Technical Barriers to Trade (TBT) Committee.
ICS
23.040.50
DOI
https://dx.doi.org/10.1520/F3632-23
Loading recommended items...
Loading recommended items...
Loading recommended items...