Standards Worldwide
Standards Worldwide
Phone +49 30 58885700-07

Draft technical rule

VDI 3975 Blatt 3:2016-08 - Draft

Storages of hazardous substances - Operation of warehouses

German title
Lagerung von Gefahrstoffen - Betreiben von Gefahrstofflagern
Publication date
2016-08
Original language
German
Pages
30

from 98.10 EUR VAT included

from 91.68 EUR VAT excluded

Format and language options

PDF download
  • 98.10 EUR

Shipment (3-5 working days)
  • 109.00 EUR

Monitor with the Standards Ticker

This option is only available after login.
Easily subscribe: Save time and money now!

You can also subscribe to this document - together with other important standards in your industry. This makes your work easier and pays for itself after a short time.

Sparschwein_data
Subscription advantages
Sparschwein Vorteil 1_data

Important standards for your industry, regularly updated

Sparschwein Vorteil 2_data

Much cheaper than buying individually

Sparschwein Vorteil 3_data

Useful functions: Filters, version comparison and more

Publication date
2016-08
Original language
German
Pages
30

Quick delivery via download or delivery service

Buy securely with a credit card or pay upon receipt of invoice

All transactions are encrypted

Short description
This standard describes the phases of construction and operation following the the planning and approval of a warehouse for hazardous substance. Accordingly the term "operate" is taken very broad: It includes not only the actual operation of the warehouse and its establishment on the basis of permits and licences; furthermore the possible future change, extension and decommissioning of hazardous material warehouses. "Operation" means all provisions and measures belonging to the secure operating sequence of a storage operation. This primarily includes organisational requirements, such as the organisational structure of the responsible persons, the operational structure of the physical check and the goods pass and the operating organisation that governs the particular responsibility of the workers. As far as technical equipment for processes (such as IT systems or automatic controls) are used, their function for the "operation" is also set out. The organisational planning is discussed in VDI 3975 Part 2. The standard describes the peculiarities in the operation of a hazardous material warehouse, the necessary steps and measures during the construction and commissioning of a warehouse, including operation and the associated operational arrangements. The standard can be used to plan, check and supplement operational measures in a hazardous materials warehouse. With any changes or enhancements in a hazardous materials warehouse, the standard contributes to correctly assess the consequences and the scope, and also to take the necessary steps. Necessary activities are listed for significant changes in structure or usage as well as for the cease of storage operation and the dispose of the storage installation (demolition and safe disposal). The standard lists a compilation of the main tasks and duties, as they are imposed on the operator of a hazardous substance warehouse - either if these provisions derive from legislation or from their own entrepreneurial requirements ("corporate philosophy"). The appropriate measures to protect people and the environment are described which are to be generated, implemented and constantly to be updated.
Content
ICS
13.300, 55.220
Also available in
Loading recommended items...
Loading recommended items...
Loading recommended items...
Loading recommended items...